tasks:

Specialists of our company took part in the development of project documentation to strengthen the power supply systems of the Tagansko-Krasnopresnenskaya Metro line as part of increasing the capacity of rolling stock.

Start of work – March 2016, completion of work – December 2016

.

results:

A survey of tunnels and measurement work was carried out.
An adjustment of the Technical Specification for the design was made.
Project documentation has been developed to strengthen the power supply systems of the Tagansko-Krasnopresnenskaya Metro line, which includes:
traction network 825V;
interlocking communication between substations and disconnector control;
laying of cables through the operated tunnel.

.

A positive conclusion was received in the State examination.

.

The project was completed exactly on time.